Click here for our general conditions of delivery.
Learn more:
The importance of an end-of-warranty analysis for wind turbine owners
When the warranty period of the Original Equipment Manufacturer (OEM) is almost over, an end-of-warranty analysis becomes essential for wind turbine owners. During the warranty period, the OEM is responsible…
4 first checks when installing, commissioning and troubleshooting an overspeed protection system
It is essential to verify the functioning of every individual component of an overspeed protection system. This can be done during its installation, commissioning / turnarounds or troubleshooting. As this…
Explained: voting structures of overspeed protection systems
Voting, regarding overspeed protection systems, can be defined by the number of safety loops that should switch to the safe state when an overspeed situation is detected. The desirable voting…